title.gif
spacer.gif

2002 Above Grade Walls

pier1imports.JPG - 29297 Bytes
Pier 1 Imports - Minot

Owner:
Engen Eckmann

Entered by:
Strata Corporation

Contractor:
Herslip Construction and Schlager Concrete, Inc.

Structural Engineer:
Heyer & Loos Engineering

Architect:
Torno Nester Davison, PC

Speed of construction was a major reason the owner switched from a steel frame structure to the insulated concrete form (ICF) wall systems for this project. The five-man wall crew was on site for only seven days for this 8,320 square foot commercial structure. In addition to construction speed, other benefits of this ICF system include fire resistance, sound proof walls, high wind load resistance, heating and cooling cost savings, and long life. The architect-specified split faced colored concrete masonry units were combined with stucco for the outside. Such foresight will promote essentially a totally maintenance free exterior.