![]() |
|||||||||||||||
Owner: Congratulations to the Fargo Parks Department for providing citizens of the Timberline-Fox Run subdivision a quality
recreational trail. The bends, terrain and tie-ins combined with limited site access to make this project a most difficult
challenge for the contractor, but most appealing for the trail user. Bikers, roller-bladers, baby strollers and walkers will
appreciate the long-lived smooth surface that is inherently available with a concrete trail. This winning entry demonstrates perfection in aesthetics, convenience and effective interaction with the surrounding neighborhood and landscape.
City of Fargo
Entered by:
Ames Ready Mix
Civil Engineer:
Ulteig Engineers, Inc.
Contractor:
Specialized Contracting, Inc.